How to order

What to know before the first order

No prices here, because they move. Everything else a first order needs is on this page.

How to order

  • FOB / CFR / CIF
  • Shanghai or Ningbo
Terms

Commercial terms

Consolidation warehouseExport documents
Commercial terms
Minimum orderSet per reference, not per order. A mixed container usually reaches it across several families.
IncotermsFOB Shanghai or Ningbo, CFR or CIF to your port. We can also hand the cargo to your own forwarder.
PaymentAgreed in the quotation for each order, together with the Incoterm.
Lead timeQuoted line by line before you commit, because it depends on stock at the plant and on volume.
SamplesCan be requested for a new reference before the order. Cost and courier are set in the quotation.
PackingWooden reel or coil for rope, drum or carton for chain, carton on pallet for hardware. Export packing for sea freight, with your marks if you send them.
DocumentsCommercial invoice, packing list, bill of lading, certificate of origin and the mill test certificates of the lot.
After the shipmentPhotographs of the loaded goods and the inspection sheet stay on file, so a claim can be traced to its lot.
Sequence

Where the time goes

The order of the six steps and the weight each one carries. The lead time of each line is confirmed in the quotation.

From your list to the portSequence, not a calendar

01You send the list

Reference, size and quantity. The list button on every product page builds it for you.

same day
02We quote against it

Unit price by size, minimum per reference, Incoterm and lead time, line by line.

per quotation
03Sample or drawing, if the line is new

A sample or a dimensioned drawing settles what is being bought before production.

per quotation
04Production and inspection

The lot is produced, checked in line and checked again before the container is sealed.

per quotation
05Consolidation and shipment

Everything meets in one warehouse, loads into one container and sails from Shanghai or Ningbo.

per quotation
06Documents

Invoice, packing list, bill of lading, certificate of origin and the mill test certificates of the lot.

with the shipment
Step
listquotationproductioncontainerport
Lead time per line in the quotationShanghai or NingboIncoterm agreed before production
Next step

Send the list and we price it

Reference, size, quantity and destination port. A quotation comes back with the unit price, the minimum per line, the Incoterm and the lead time.